Wednesday, October 29, 2008

Post Contract Variations

Besides the standard inclusions and the promo package that we've taken up, here are the list of post contract variations :)

1

Extension of the garage by 1500mm

2

Include 2100mm x 2400mm roller door to the rear of garage

3

Internal access from the garage

4

Upgrade to Corinthian PMAD104 Front Entry door with translucent glazing

5

Upgrade to Corinthian Translucent glazing to Front Entry Frame sidelights

6

Keyed locks to all upper floor openable windows

7

Include doors to WIR in Master Bedroom and Bedroom 2

8

Include door to Ensuite

9

Upgrade to 4-panel doors to all ground floor doors (Total of 7)

10

Upgrade front entry deadbolt to Gainsborough Contemporary Trilock

11

Privacy lock to all bedrooms, Ensuite, Bath, WC, Powder (Total of 8)

12

Relocate window in Rumpus

13

Include 900mm x 850mm pot drawers in Pantry

14

Upgrade cabinet handles to Kitchen, Pantry, Laundry

15

Security system NX12 with 4 detectors

16

2-way switch in Master Bedroom

17

Upgrade batten holders and add to downlights (Total of 59)

18

Include 2 external junction box for lights outside garage

19

Addition of 3 TV points (Total of 4)

20

Addition of 1 telephone point (Total of 2)

21

Addition of 10 double power points

22

Addition of light point inside stairs area

23

Addition of 2 double waterproof power points

24

Upgrade heating control for downstairs/upstairs both to be variable

25

Include network controller for heating and evaporative cooling system

26

Upgrade wall shower mixer to Ensuite and Bathroom

27

Upgrade handheld showers to Ensuite and Bathroom

28

Niche to Bathroom shower

29

Addition of 1 external garden tap

30

Tile floor coverings to whole of ground floor

31

Render finish to Portico

32

Off-White mortar

33

Include Bradford Soundscreen R1.5 Insulation to Dining internal walls of upper floor waste void only

34

Include Bradford Soundscreen R1.5 Insulation to Bathroom/Bed4

35

Include Bradford Soundscreen R1.5 Insulation to Bathroom/Bed3

36

Upgrade external wall insulation to R2.0 Glasswool Batts

4 comments:

Toni said...

Upgrades/variations sound good. Just wondering how you went about adding the evap cooling unit to the study? Did you have to upgrade the current unit? We asked to do this also but were told that we needed to buy a 2nd smaller unit for this. Thanks.

hYSteRIcAL said...

My apologies... after reading your comment, I checked through the variations again and you're right, PD had taken out this request saying it cannot be done due to construction constrains. Thanks for highlighting. All the paperwork were done so long ago and it slipped off my mind :)

Toni said...

oh no thats fine! We asked for this too but they said they would only do it if we bought a 2nd unit and at $3500 we didn't think it was worth it for one vent! The manufacturers (Bonaire) said that the study should get fed from the lounge so we'll wait and see.

Thanks for replying.

hYSteRIcAL said...

Well at least your CS gave you option for 2nd unit, I don't think we were told of this option. But anyway, even if they did, it is too expensive to do it.